Tunnel and hull
The stock GRP options have a 185 mm bore and 4 mm wall. Your installer selects the stock length and trims it to the hull. Tunnel position, submergence and opening shape affect performance.
A metal hull needs a suitable metal tunnel and the manufacturer’s isolation arrangement. Those parts require a separate configuration.